Request for Proposal – Pala Fitness Center Drain Project
Request for Proposal
Pala Fitness Center Drain Project
REQUEST FOR PROPOSALS
Project Name: Pala Fitness Center Drain Project
Project Address: 12194 Pala Mission Road, Pala, CA 92059
Project Type: Repair/Correct 17 Drains – Roof Drains and the drain pipes from roof to termination.
Scope of work:
- Ensure all drains are properly connected, reinforced and supported from roof to point of termination.
Required Site Meeting: Interested contractors must walk the job. Job walk is scheduled for Monday, April 18, 2022 at 9am. Contractors can meet at the main office entrance. Job walk will be conducted by Annalee Trujillo.
Proposal Requirements: Contractors must include their best approach to properly connect, reinforce and support the drainage system at the Pala Fitness Center to alleviate flooding issues. A diagram, type of materials that will be used must be included in the scope.
Contractor Requirements: Contractors must be licensed, bonded and insured in the state of California.
Instructions to Contractors: If you are interested in quoting the project, you can add your name to the list of contractors by emailing Annalee Trujillo at atrujillo@palatribe.com and cc Lorraine Smith at lsmith@palatribe.com. You may also contact our offices at 760-891-3529. Indian Preference does apply.
Information needed to be put on the list of eligible Contractors: Company Name, License Number, Contact Name and number.
Submission: Quote submission is due no later than 4:00pm on April 26, 2022. A start date, timeline for completion must be included. Quotes can be submitted to atrujillo@palatribe.com and cc lsmith@palatribe.com
Request - Pala Fitness Center RFP April 2022